Monday 15 May 2017

Jayanagar Swimming Pool Construction work

Jayanagar Swimming Pool Construction Work Ground Breaking ceremony





Jayanagar Swimming Pool construction work was started today by Bengaluru City Mayor Smt. Padmavathi. Jayanagar MLA Sri B.N. Vijaya Kumar and BBMP Member Sri N.Nagaraju were present during the event.

The Pool will be built by PM Swimming on the basis of Build, Operate & Transfer (BOT) Model.

Visit Jayanagar Swimming pool Construction work for more picture and details.
Stay connected with me:
FB Fan Page: Facebook
Follow: Twitter
Follow: Pinterest
Watch Video: YouTube
Watch Video: vimeo 

2 comments:

  1. This is a very useful post, I was looking for this info. thanks for sharing the great ideas...
    new driveway cost Wellington

    ReplyDelete
  2. This is very nice one and gives indepth information. thanks for this nice article.best paver near Boynton

    ReplyDelete